I have been assured by the Highways dept of
NYCC that the Hodge Lane bridge is safe and that patches will be made to the damaged tarmac very shortly. This is pending a full repair to the path and the railing surrounding the bridge which is scheduled to be carried out by the end of March.
Add a comment